Click the link where it says Click here on the issue configuration screen (under Issue Display Mode).
Please refer to this document if you need more information about the issue display mode.
If the current issue display mode is set to displaying specified issue type mode, you need to specify the issue types to be displayed.
To add an issue type, follow the steps below:
2. Select an Issue Type.
3. Configure the various settings, as shown below.
4. Click Update.
5. The issue type is added, as shown.
Issue settings, such as plan dates and progress rate (percent done) displayed in WBS, and child issue issue types, can be updated as follows:
Click Hide on the far right-hand side of the issue type row.
Instead of using the custom fields included when you first install WBS Gantt-Chart, you can use other custom fields for the plan and the baseline, such as Create Date or Due Date.
To edit these, select a field from Start Date, Finish Date, Baseline Start Date and Baseline Finish Date, in the issue configuration dropdown menu. The list of options is as follows:
If (Default) is selected, the default settings fields are used. However, note that selecting the same field for Start Date, Finish Date, Baseline Start Date, and Baseline Finish Date may lead to unexpected errors in the performance of the software.
If you wish to make these four dates non-editable (view only), check the Not Editable box for each date. When Create Date is selected as a field, it will always be "Not Editable".
If the plan dates are set to Not editable, they will not be adjusted when you use Cascade Changes or Auto-correct Schedule. Therefore we advise you not to check the Not Editable boxes unless you have a specific reason to do so.
In the issue configuration screen, select Percent Done. You can select one from four configurations as follows:
Uses the default progress rate settings.
The percent done is based on specified numeric fields. You can edit these values in WBS Gantt-Chart.
Automatically calculates progress rate based on the "time spent" and the "time remaining estimate." The equation is as follows:
Time Spent / (Time Spent + Time Remaining Estimate) * 100 |
Automatically calculates progress rate based on the selected fields for Numerator and Denominator. You cannot edit these in WBS Gantt-Chart. The equation is as follows:
Numerator / Denominator * 100 |
If you select Use specific field, the progress rate updates automatically depending on the status of the issue.
Where the following boxes are checked - When an issue is resolved, the percent done automatically becomes 100% or When an issue is re-opened, the percent done automatically becomes 0% - percent done automatically displays 100% when an issue is resolved, and resets to 0% if an issue is reopened.
When creating a child issue from an issue, you can restrict by issue type.
Select the issue type for the child issue to be created, by selecting Individually specified in Child issue issue type on the issue configuration screen.
Select All issue types to be displayed in Child issue issue type on the issue configuration screen.
If too many issues are displayed this may lead to a deterioration in the performance of the software. To prevent this, you can edit the maximum number of issues to be displayed.
When you create a version or issue from a project or version, you specify whether to set the creation date as the planned date.
If an issue does not have a planned date set, the Auto-Correct Schedule function may not work correctly. Please enable Set today’s date unless there is a specific reason not to do so. This setting is disabled in all versions earlier than 7.9.0.
Issue templates are created and managed on a project by project basis. You cannot create an issue using the issue template of another project.
You can resolve this by sharing issue templates for specified projects across all projects.
Specify that a project's issue templates can be shared in Issue Template Share Project on the issue configuration screen.
You can use issue templates across all the projects you specify. You can also restrict the editing of issue templates by adjusting the permissions for the specified project.
When changing issue structures by 'dragging-and-dropping' an issue, you can make changes in the structure outside the allowable combinations of issue types for parent-child relationships.
In order to restrict the use of drag-and-drop for child issues to allowable combinations for parent-child relationships, please enable Restrict for configuring child issues in Restrictions for using drag-and-drop to ensure the right configuration for creating child issues.