The content of this Space is not the latest version of WBS Gantt-Chart for Jira.
We have separate Space for each version of the product. If the version you are using differs from the one in this Space title, please find the correct one from the below page.
https://rssupport.atlassian.net/wiki/spaces/WGC/overview
Editing in issue detail view
To edit in issue detail view
When View > Issue detail view on the operations bar is enabled, the issue detail view is displayed on the right-hand side of the screen for the row of the selected issue.
If you edit an issue in the issue detail view, your changes are immediately shown in the WBS (with certain exceptions).
Both editing and inline editing in the edit dialog can be used to show immediate updates.
All fields in the selected issue row are updated with the latest information, not just the edited field.
For WBS fields that are edited, values are overwritten with the latest information saved in Jira. It is recommended that you do not edit the WBS and the issue detail view at the same time.
Edits that do not update immediately
The following edits are not updated and displayed immediately. In order to display these, you need to reload the screen in your browser.
Edits that change the hierarchical structure
Edits that affect the hierarchical structure are not immediately updated in the WBS. Examples are shown below (The displayed hierarchical structure remains unchanged.)
- Creation/deletion of parent-child relationships (including epic, subtasks)
- Version changes
However, if you delete an issue in the issue details view, this is an exception and is immediately updated.
Edits that change a dependency relationship
When you create or delete an issue link using dependency issue links, the change is not immediately reflected on the WBS Gantt-Chart screen.
Voting and watching
If you vote or cancel a vote in the issue detail view, or watch/stop watching an issue, this is not immediately reflected in the "Votes" or "Watching" columns in the WBS.