WBS Gantt-Chart for Jira 9.7.2 release notes

2 August 2018

The Ricksoft team is proud to announce the release of Version 9.7.2 of WBS Gantt-Chart for Jira.

Improvement

Disable Gantt chart display period jumping when selecting Gantt bar or Due date icon to improve the operability of Gantt chart plan editing

When selecting Gantt bar or due date icon, we disabled Gantt chart display period jumping, which was introduced at WBS Gantt-Chart for Jira 9.5. It makes plan editing by mouse operation on the Gantt chart part easier.

Since the display position does not jump automatically during the plan editing operation, plan editing work can be performed smoothly without losing sight of the operated Gantt bar or Due date icon.

Improve visibility of issue summary in tooltip displayed when mouseover Gantt bar

We changed the character color of the issue summary part to one with high contrast with the background color, and the visibility was improved.